Investigating Environmental Impact Assessment (EIA) In Early Studies (Zero-Phase) to Prevent Delay in Operation of Construction Projects

Iraj Jalali, S. Mahammad Poorhashemi, Alireza Mirjalili

Abstract


Delay in project execution is one of the outmost problems that lead to delay to operation and subsequently, early structural erosion or financial supply disturbance, etc. Delay is fallen into several categories and each category has its own specific origin. However, in the present paper, environmental factors causing delay to projects are investigated. Delay to Construction Projects operation can be prevented by embedding environmental studies, namely environmental impact assessment (EIA) in initial studies. Given that environmental events cannot be predicted and we can only rely on statistic reports of previous periods, the effect of embedding such assessment in projects is so useful that every manger is convinced to make use of this assessment in study phase. The research results revealed that it is necessary to present EIA in initial studies to prevent delay to Construction Projects operation. In the following, given to the necessity of checklist, the quality of the designed checklist was investigated. Finally, the checklist was implemented and checked. In this study, each of the research questions was separately tested.


Keywords


Environmental Impact Assessment (EIA), Construction Project; Environmental Checklist; Delay.

References


Zheng, Lina, Baoxiu Zhao, Hong Wang, and Hengming Liu. “Environmental Risk Identification of Port Construction Project.” Procedia Environmental Sciences 10 (2011): 2783–2787. doi:10.1016/j.proenv.2011.09.431.

Miladi Rad, Kaveh, and O. Aminoroayaie Yamini. “The Importance and Use of Risk Management in Various Stages of Construction Projects Life Cycle (PLC).” Modern Applied Science 11, no. 1 (October 5, 2016): 48. doi:10.5539/mas.v11n1p48.

Sarmah, Purbashree, and Arvind K. Nema. “Fuzzy Logic Based Performance Evaluation of EIA Reports for Hydroelectric Projects.” Water Science and Technology Library (December 30, 2017): 153–165. doi:10.1007/978-981-10-5792-2_13.

Li, Fachao, and Li Wang. “Generalized Expected Value Model for Stochastic Programming and Its Application in Transportation Problems.” 2009 First International Conference on Information Science and Engineering (2009). doi:10.1109/icise.2009.621.

Arbter, Kersten. “Sustainability Impact Assessment and Strategic Environmental Assessment.” OECD Sustainable Development Studies (June 11, 2008): 35–40. doi:10.1787/9789264047266-4-en.

Pourrostam, Towhid, and Amiruddin Ismail. “Causes and Effects of Delay in Iranian Construction Projects.” International Journal of Engineering and Technology 4, no. 5 (2012): 598–601. doi:10.7763/ijet.2012.v4.441.

HODGSON, E C. “MARINE AIRPORT FACILITIES FOR CIVIL FLYING BOATS. AIRPORT ENGINEERING DIVISION.” The Institution of Civil Engineers Engineering Division Papers 5, no. 20 (January 1947): 3–17. doi:10.1680/idivp.1947.13091.

Chan, Daniel WM, and Mohan M. Kumaraswamy. "Compressing construction durations: lessons learned from Hong Kong building projects." International Journal of Project Management 20, no. 1 (2002): 23-35.

Odeh, A. M., and Battaineh, T. H. (2002). ‘Causes of construction delay: traditional contracts” International Journal of Project Management, 20; 67-73.

Sonuga, Femi, Obi Aliboh, and David Oloke. “Particular Barriers and Issues Associated with Projects in a Developing and Emerging Economy. Case Study of Some Abandoned Water and Irrigation Projects in Nigeria.” International Journal of Project Management 20, no. 8 (November 2002): 611–616. doi:10.1016/s0263-7863(02)00029-7.

Frimpong, Yaw, Jacob Oluwoye, and Lynn Crawford. “Causes of Delay and Cost Overruns in Construction of Groundwater Projects in a Developing Countries; Ghana as a Case Study.” International Journal of Project Management 21, no. 5 (July 2003): 321–326. doi:10.1016/s0263-7863(02)00055-8.

Diliman, Quezon City. "Traffic impact assessment for sustainable traffic management and transportation planning in urban areas." In Proceedings of the Eastern Asia Society for Transportation Studies, vol. 5, pp. 2342-2351. 2005.

Htun, Nay. “EIA AND SUSTAINABLE DEVELOPMENT.” Impact Assessment 8, no. 1–2 (June 1990): 15–23. doi:10.1080/07349165.1990.9726025.

“Project Execution.” Project Management Case Studies (April 21, 2017): 211–308. doi:10.1002/9781119389040.ch9.

Sommer, Hans. “Fundamentals of Project Execution.” Project Management for Building Construction (December 12, 2009): 2–15. doi:10.1007/978-3-642-10874-7_1.

Li, Xiaodong, Yimin Zhu, and Zhihui Zhang. “An LCA-Based Environmental Impact Assessment Model for Construction Processes.” Building and Environment 45, no. 3 (March 2010): 766–775. doi:10.1016/j.buildenv.2009.08.010.


Full Text: PDF

DOI: 10.28991/cej-030973

Refbacks

  • There are currently no refbacks.




Copyright (c) 2018 Iraj Jalali, S. Mahammad Poorhashemi, Alireza Mirjalili

Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 International License.
x
Message