Cost & Time Interaction Behavior on Construction Materials Procurement and Execution Processes in Infrastructure Projects

Aktham Kh. Majeed, Kadhim Raheim Erzaij

Abstract


The cost of construction materials forms a large proportion of the total cost of construction projects Thus, the lack of a sound time and cost management planning for construction materials procurement will lead to deficiencies in the supply and flow of construction materials, not to mention its negative consequences of delays and financial losses which are often cited as major causes of product degradation. This research will present the development of an applicable procurement management system model particularly for UPVC & Ductile pipes used in water and sewage water infrastructure Projects in Iraq. Actual data are collected from seven Iraqi infrastructure projects. These data are analyzed by using SBSS v. 23 statistical analysis programs. On the bases of analyses results, four mathematical relationships have been developed by using MATLAB R2015B & CurveExpert Basic software to be used on building a realistic procurement management system with accurate, acceptable, and appropriate results for the construction materials procurement conditions in Iraq, the system was finally tested by using actual data from Al-Latifiyia sewer project in Baghdad governorate, where the system showed an accuracy results of 86%.


Keywords


Construction Materials Management; Cost & Time Relationship; Procurement System Model.

References


Qassem Nayef Al-Mahawy , Duaa Hussein Al-Waily “The impact of knowledge areas on the quality of the project A field study of the opinions of a sample of workers in the construction projects of the Ministry of Construction and Housing in Dhi Qar province” Muthanna Journal for Administrative and Economic Sciences 9 no. 1 (August 25, 2019): 8-25.

Said, Hisham, and Khaled El-Rayes. “Optimizing Material Procurement and Storage on Construction Sites.” Journal of Construction Engineering and Management 137, no. 6 (June 2011): 421–431. doi:10.1061/(asce)co.1943-7862.0000307.

Jassim, Abdullah Basim. "The Best Strategy for Fuzzy Stock Management-Applied Research in Baghdad Soft Drinks Company." Master Thesis, University of Baghdad, (2016).

Hussain, Ahmed Ibrahim. "The Role of Determining the Economic Quantity of the Demand in Reducing the Total Costs of Inventory a Case Study in the Institute of Technical Management / Baghdad." Journal of Economics and Administrative Sciences 25, no. 111 (2019): 398-412.

Erzaij, Kadhim Raheem, and Aula Sakban Bidan. "Management Model for Evaluation and Selection of Engineering Equipment Suppliers for Construction Projects in Iraq." Journal of Engineering 22, no. 6 (2016): 1-16.

Jassim, Nidal Adnan. “Evaluation Contruction Companies from Aspect of Preparing Tim Schedules for Iraq’s Construction Projects.” Master Thesis, University of Diyala, (2016).

Alwan, Safaa AL-Deen Husain, Sajeda Kadum Alkindi, Kreem Hassn. “Efficient Cost Management in the Housing Projects.” Journal of Engineering 24, no. 1 (January 2018).

Khaleel, T. A., and I. Z. Hadi. "Controlling of time-overrun in construction projects in Iraq." Engineering and Technology Journal 35, no. 2 Part (A) Engineering (2017): 111-117.

Shadhar, Alaa Kharbat, and Buroog Basheer Mahmood. "Risks of Design Stage in Iraqi Construction Project." Journal of Engineering 24, no. 3 (2018): 114-121.

Mohammed, Sawsan Rasheed, and Asmaa Jebur Jasim. "Examining the Values and Principles of Agile Construction Management in Iraqi Construction Projects." Journal of Engineering 24, no. 7 (2018): 114-133.

Saeed, Yousif Salam. “Cost and Time Risk Management in Construction Projects.” Tikrit Journal of Engineering Sciences 25, no. 1 (March 1, 2018): 42-48. doi:10.25130/tjes.25.1.07.

Cui, Lindner and. "Supply Chain Performance Measurement – a Research of Occurring Problems and Challenges." Jönköping International Business School 11, no. 551 (June 2009).

McDermott, P., Y. Melaine, and D. Sheath. "Construction Procurement Systems-What choice for the Third World?." CIB REPORT (1994): 203.

Caldas, Carlos H., Cindy L. Menches, Pedro M. Reyes, Laure Navarro, and Daniel M. Vargas. “Materials Management Practices in the Construction Industry.” Practice Periodical on Structural Design and Construction 20, no. 3 (August 2015): 04014039. doi:10.1061/(asce)sc.1943-5576.0000238.

Pérez-Salas, Gabriel, Ricardo J Sánchez, and Gordon Wilmsmeier. "Status of Implementation of the Almaty Programme of Action in South America." Natural Resources and Infrastructure Series, no. 167 (2014).


Full Text: PDF

DOI: 10.28991/cej-2020-03091489

Refbacks

  • There are currently no refbacks.




Copyright (c) 2020 Aktham Khalid Majeed

Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 International License.
x
Message