Labor Productivity Study in Construction Projects Viewed from Influence Factors
Abstract
Doi: 10.28991/CEJ-2023-09-03-07
Full Text: PDF
Keywords
References
Juliansyah, A. (2014). Analysis of Labor Productivity in Pile Drilling Work. Student Curve (Kurva Mahasiswa), 1(2), 822-842. (In Indonesian).
Soekiman, A., Pribadi, K. S., Soemardi, B. W., & Wirahadikusumah, R. D. (2011). Factors relating to labor productivity affecting the project schedule performance in Indonesia. Procedia Engineering, 14, 865-873. doi:10.1016/j.proeng.2011.07.110.
Gurmu, A. T. (2019). Tools for Measuring Construction Materials Management Practices and Predicting Labor Productivity in Multistory Building Projects. Journal of Construction Engineering and Management, 145(2), 4018139. doi:10.1061/(asce)co.1943-7862.0001611.
Kog, Y. C. (2019). Construction Delays in Indonesia, Malaysia, Thailand, and Vietnam. Practice Periodical On Structural Design And Construction, 24(3), 04019013. doi:10.1061/(ASCE)SC.1943-5576.0000434.
Ahn, S., Lee, S., & Steel, R. P. (2014). Construction Workers’ Perceptions and Attitudes toward Social Norms as Predictors of Their Absence Behavior. Journal of Construction Engineering and Management, 140(5), 4013069. doi:10.1061/(asce)co.1943-7862.0000826.
Gurmu, A. T. (2019). Tools for measuring construction materials management practices and predicting labor productivity in multistory building projects. Journal of Construction Engineering and Management, 145(2), 04018139. doi:10.1061/(ASCE)CO.1943-7862.0001611.
Heravi, G., & Eslamdoost, E. (2015). Applying Artificial Neural Networks for Measuring and Predicting Construction-Labor Productivity. Journal of Construction Engineering and Management, 141(10), 4015032. doi:10.1061/(asce)co.1943-7862.0001006.
Johari, S., & Neeraj Jha, K. (2021). Framework for Identifying Competencies of Construction Workers. Journal of Construction Engineering and Management, 147(5), 4021034. doi:10.1061/(asce)co.1943-7862.0002037.
Sheikh, N. A., Ullah, F., Ayub, B., & Thaheem, M. J. (2017). Labor productivity assessment using activity analysis on semi high-rise building projects in Pakistan. Engineering Journal, 21(4), 273–286. doi:10.4186/ej.2017.21.4.273.
Khan, S. S., Amjad, M., Gilani, I. H., Larkin, S., Shareef, H., & Sher, W. A. (2022). High Voltage & Short Circuit Testing Laboratories in Economic Growth of African Region: A Prospect for Prosperity. International Journal of Engineering Trends and Technology, 70(10), 67–78. doi:10.14445/22315381/IJETT-V70I10P209.
Al-Kofahi, Z. G., Mahdavian, A., & Oloufa, A. (2022). System dynamics modeling approach to quantify change orders impact on labor productivity 1: principles and model development comparative study. International journal of construction management, 22(7), 1355-1366. doi:10.1080/15623599.2020.1711494.
Rangan, P. R., & Tumpu, M. (2022). Influence of coconut shell ash and lime towards CBR value and subgrade bearing capacity. AIP Conference Proceedings, 2391. doi:10.1063/5.0079014.
Ünsal Altuncan, İ., & Tanyer, A. M. (2018). Context-Dependent Construction Conflict Management Performance Analysis Based on Competency Theory. Journal of Construction Engineering and Management, 144(12), 4018112. doi:10.1061/(asce)co.1943-7862.0001581.
Hutasoit, J. P., & Sibi, et al. (2017). Analysis of Construction Labor Productivity in the Work of Pairing Ceramic Floors and Plastering Walls Using the Work Sampling Method. Journal of Civil Statistics, 5(4), 205–214. (In Indonesian).
Tezeswi, T. P., & MVN, S. K. (2022). Implementing construction waste management in India: An extended theory of planned behaviour approach. Environmental Technology & Innovation, 27, 102401. doi:10.1016/j.eti.2022.102401.
Karatas, I., & Budak, A. (2022). Development and comparative of a new meta-ensemble machine learning model in predicting construction labor productivity. Engineering, Construction and Architectural Management, Emerald. doi:10.1108/ECAM-08-2021-0692.
Juliansyah A. (2016). Analysis of Labor Productivity in Piling Works (Case Study of the Pile Slab Approach Road Development Project at Ing Martadipura Bridge, Kota Bangun District). Thesis, Department of Civil Engineering, Faculty of Engineering, University August 17, 1954 Samarinda, Indonesia.
Dadi, G. B., Goodrum, P. M., Taylor, T. R. B., & Carswell, C. M. (2014). Cognitive Workload Demands Using 2D and 3D Spatial Engineering Information Formats. Journal of Construction Engineering and Management, 140(5), 4014001. doi:10.1061/(asce)co.1943-7862.0000827.
Abdel-Hamid, M., & Mohamed Abdelhaleem, H. (2022). Impact of poor labor productivity on construction project cost. International Journal of Construction Management, 22(12), 2356-2363. doi:10.1080/15623599.2020.1788757.
Seyis, S. (2019). Pros and Cons of Using Building Information Modeling in the AEC Industry. Journal of Construction Engineering and Management, 145(8). doi:10.1061/(asce)co.1943-7862.0001681.
Jarkas, A. M. (2016). Effect of Buildability on Labor Productivity: A Practical Quantification Approach. Journal of Construction Engineering and Management, 142(2), 6015002. doi:10.1061/(asce)co.1943-7862.0001062.
Vereen, S. C., Rasdorf, W., & Hummer, J. E. (2016). Development and Comparative Analysis of Construction Industry Labor Productivity Metrics. Journal of Construction Engineering and Management, 142(7), 4016020. doi:10.1061/(asce)co.1943-7862.0001112.
DOI: 10.28991/CEJ-2023-09-03-07
Refbacks
- There are currently no refbacks.
Copyright (c) 2023 Rusdi Usman Latief

This work is licensed under a Creative Commons Attribution 4.0 International License.