[1]
Shi, X. et al. 2022. Analysis of the Schedule Risk of Prefabricated Buildings Based on ISM and Research of Transfer Path. Civil Engineering Journal. 8, 1 (Jan. 2022), 134–144. DOI:https://doi.org/10.28991/CEJ-2022-08-01-010.