[1]
Tahir, Y. et al. 2023. Design of Controlled Pre-Split Blasting in a Hydroelectric Construction Project. Civil Engineering Journal. 9, 3 (Mar. 2023), 556–566. DOI:https://doi.org/10.28991/CEJ-2023-09-03-05.