[1]
ElDawody, S.M. et al. 2026. A Construction Project Scheduling Approach for Petroleum Refinery Turnaround Maintenance Using Hybrid GA–LOB Optimization. Civil Engineering Journal. 12, 6 (Jun. 2026), 2386–2401. DOI:https://doi.org/10.28991/CEJ-2026-012-06-013.