[1]
Wu, L. et al. 2019. Displacement and Deformation of the First Tunnel Lining During the Second Tunnel Construction. Civil Engineering Journal. 5, 2 (Feb. 2019), 332–339. DOI:https://doi.org/10.28991/cej-2019-03091248.