Khaled, Z. S. M., Abid Ali, R. S., & Hasan, M. F. (2018). Modeling the Completion Time of Public School Building Projects Using Neural Networks. Civil Engineering Journal, 3(12), 1266–1277. https://doi.org/10.28991/cej-030956