Khaled, Z. S. M., Abid Ali, R. S. and Hasan, M. F. (2018) “Modeling the Completion Time of Public School Building Projects Using Neural Networks”, Civil Engineering Journal, 3(12), pp. 1266–1277. doi: 10.28991/cej-030956.