Yusuf, M. (2025) “Fuzzy Bayesian Belief Networks Method on Risk Assessment of EPC Pipeline Project”, Civil Engineering Journal, 11(3), pp. 1050–1071. doi: 10.28991/CEJ-2025-011-03-013.