Classification of Precast Concrete Segments Damages during Production and Transportation in Mechanized Shield Tunnels of Iran
Abstract
Precast concrete segments used in shield tunnel linings are prone to damage in many situations. These damages can occur at different stages such as fabrication in segment factory, transportation to tunneling site, during tunneling process, and at serviceability stage. The aim of the present article is to study the damages inflicted on concrete segments during production and transportation, and to present a new classification of these damages throughout the two stages. The developed classification is based on field observations and examinations of major subway and water conveyance mechanized shield tunnels of Iran, located in Tehran, Tabriz, Mashhad, Kermanshah (Nosood) and Isfahan (Golab). The quality of tunnel lining suffers from what, as a direct consequence of any damage to concrete segments, during production and transportation, which will be also discussed in this article. For further investigation, more than 250 concrete segments from Tehran subway line 3 and 350 segments of concrete segments from Tehran subway line 7 were selected and studied for a statistical analysis of chipping and crack, consecutively. Absence of preventive measures to limit segment damages in precast segment factories is one of the main reasons for increased number of damaged concrete segments, and as a result, increased costs of tunnel construction at later stages. In this paper, production phase damages and factors contributing to these damages are studied. According to the findings of the study, the human (operator) error was the most important cause for chipping, and, time-dependent behavior of concrete was the essential reason in crack of precast segments. Eventually, final section of the article presents practical solutions for reduction of damages during fabrication and transportation of concrete segments.
Keywords
References
V. Guglielmetti, P. Grasso, A. Mahtab, S. Xu, Mechanized tunnelling in urban areas: design methodology and construction control, CRC Press, 2008.
AFTES, Association Française des Tunnels et de l'Espace Souterrain, France, 1997.
S. Mitsutaka, Causes of shield segment damages during construction, International Symposium on Underground Excavation and Tunnelling, (2006).
C.B.M. Blom, "Design philosophy of concrete linings for tunnels in soft soils", (2002).
S. Cavalaro, C. Blom, J. Walraven, A. Aguado, "Structural analysis of contact deficiencies in segmented lining", Tunnelling and Underground Space Technology, 26 (2011) 734-749.
J.-s. Chen, H.-h. Mo, "Study on effect of segments erection tolerance and wedge-shaped segment on segment ring in shield tunnel", Journal of Zhejiang University-SCIENCE A, 7 (2006) 1864-1869.
J. Chen, H. Mo, "Numerical study on crack problems in segments of shield tunnel using finite element method", Tunnelling and underground space technology, 24 (2009) 91-102.
H. Mo, J. Chen, "Study on inner force and dislocation of segments caused by shield machine attitude", Tunnelling and underground space technology, 23 (2008) 281-291.
J.H. Georg, K. Davorin, Selection of segmental lining system and repair classification, Proceedings of the CSSE Symposium DAMOCS. Dubrovnik, (2004).
F. Gruebl, Segmental rings (critical loads and damage prevention), International Symposium on Underground Excavation and Tunnelling, Bangkok, Thailand, (2006).
W.G. No, I.T. Association, "Guidelines for the design of shield tunnel lining", Tunnelling and Underground Space Technology, 15 (2000): 303-331.
J. Hanson, Optimum steam curing procedure in precasting plants, Journal Proceedings, (1963).
S. Mindess, J.F. Young, D. Darwin, Concrete, Prentice Hall, 2003.
M.D. Crespo, C. Molins, A.R. Marí, "Effect of variations in thermal-curing cycle on the cracking risk of precast segmental tunnel lining", Construction and Building Materials, 49 (2013): 201-213.
AASHTO, A.A.o.S.H.a.T. O., Washington DC, 2000.
A.C. 517, Accelerated Curing of Concrete at Atmospheric Pressure: State of the Art, American Concrete Institute, 1992.
PCI, Accelerated curing of concrete at atmospheric pressure –State of the art., (1980).
A. Herrenknecht, K. Bäppler, Segmental concrete lining design and installation, Soft Ground and Hard Rock Mechanical Tunneling Technology Seminar, (2003).
D. Kolic, A. Mayerhofer, "Segmental lining tolerances and imperfections", Google Scholar, 8 (2011).
C. Herrenkenect, Tehran Metro Project - line 3, (2006).
C. Selli, Tehran Metro Project - line 7 North-South section, (2008).
P.K. Mehta, Concrete. Structure, properties and materials, McGraw-Hill Publishing, 1986.
DOI: 10.28991/cej-2017-00000101
Refbacks
- There are currently no refbacks.
Copyright (c) 2017 Mohsen Ali Shayanfar, Payman Mahyar, ahmad Jafari, Mohammad Mohtadinia
This work is licensed under a Creative Commons Attribution 4.0 International License.