Impact Factors on Subcontractor's Cash Flow Management
Downloads
Doi: 10.28991/CEJ-SP2023-09-08
Full Text: PDF
[2] Youssef, M., Mohamed, M. S. E., & Balah, A. A. S. (2022). Fuzzy model for Libyan construction projects delivery system selection. International Journal of Construction Management, 1–8. doi:10.1080/15623599.2022.2113629.
[3] Egyptian Civil Law (1948). Civil, Commercial and Family Law. Egyptian Civil Law No. 131 of 1948. Cairo, Egypt.
[4] Mito, T. (2019). Developing the construction industry for employment-intensive infrastructure investments. International Labour Office, Geneva, Switzerland. Available online: https://www.ilo.org/wcmsp5/groups/public/---ed_emp/---emp_policy/---invest/documents/publication/wcms_734235.pdf (accessed on April 2023).
[5] Mbachu, J. (2008). Conceptual framework for the assessment of subcontractors' eligibility and performance in the construction industry. Construction Management and Economics, 26(5), 471–484. doi:10.1080/01446190801918730.
[6] Paul, A., & Gutierrez, G. (2005). Simple probability models for project contracting. European Journal of Operational Research, 165(2), 329–338. doi:10.1016/j.ejor.2004.04.005.
[7] Wong, W. F., & Cheah, C. Y. (2004). Issues of contractual chain and subcontracting in the construction industry. Proceedings of the 20th Annual ARCOM Conference, 1-3 September, 2004, Edinburg, United Kingdom.
[8] Arditi, D., & Chotibhongs, R. (2005). Issues in Subcontracting Practice. Journal of Construction Engineering and Management, 131(8), 866–876. doi:10.1061/(asce)0733-9364(2005)131:8(866).
[9] Harris, F. (2010). A Historical Overview of Stakeholder Management. Construction Stakeholder Management, 159, 41–55. doi:10.1002/9781444315349.ch3.
[10] Seddon, Calvert, & Yang. (2010). A Multi-Project Model of Key Factors Affecting Organizational Benefits from Enterprise Systems. MIS Quarterly, 34(2), 305. doi:10.2307/20721429.
[11] Best, R., & Meikle, J. (2022). Describing Construction: Industries, Projects and Firms. Taylor & Francis, London, United Kingdom. doi:10.1201/9781003102403.
[12] Klee, L. (2018). International Construction Contract Law. John Wiley & Sons, United States. doi:10.1002/9781119430551.
[13] Supardi, A., & Adnan, H. (2012). Security of Payment in Malaysian Construction Industry: Issues on Sub-Contract's Direct Payment. International Conference on Mechanical and Electrical Technology, 3rd, (ICMET-London 2011), Volumes 1–3. doi:10.1115/1.859810.paper323.
[14] Abdullahi, M., Ibrahim, Y. M., Ibrahim, A. D., & Ahmadu, H. A. (2017). Effects of Organisational Characteristics on Contractors' Construction Cash Flow Forecasting Capabilities. Journal of Engineering, Project, and Production Management, 7(1), 33–44. doi:10.32738/jeppm.201701.0005.
[15] Bolton, S., Wedawatta, G., Wanigarathna, N., & Malalgoda, C. (2022). Late Payment to Subcontractors in the Construction Industry. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 14(4). doi:10.1061/(asce)la.1943-4170.0000552.
[16] Nobbs, H. (1993). Future Role of Construction Specialists: A Paper by Harry Nobbs. Business Roundtable, Washington, United States.
[17] Lagiman, S. (2017). Improvement of relationship between main contractor and subcontractor for successful construction project implementation. Master Thesis, Universiti Tun Hussein Onn Malaysia, Johor, Malaysia.
[18] Polat, G., Okay, F., & Eray, E. (2014). Factors affecting cost overruns in micro-scaled construction companies. Procedia Engineering, 85, 428–435. doi:10.1016/j.proeng.2014.10.569.
[19] Ashworth, A. (2013). Contractual procedures in the construction industry (6th Ed.) Routledge, London, United Kingdom. doi:10.4324/9781315847061.
[20] Goldfayl, G. (2004). Construction contract administration. UNSW Press, Randwick, Australia.
[21] Rostiyanti, S. F., Hansen, S., & Ponda, T. N. (2020). Cause and Effect of Conditional Payments Provision to Subcontractors. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 12(1), 4519045. doi:10.1061/(asce)la.1943-4170.0000352.
[22] Chadee, A., Ali, H., Gallage, S., & Rathnayake, U. (2023). Modelling the Implications of Delayed Payments on Contractors' Cashflows on Infrastructure Projects. Civil Engineering Journal (Iran), 9(1), 52–71. doi:10.28991/CEJ-2023-09-01-05.
[23] Odeyinka, H. A., & Kaka, A. (2005). An evaluation of contractors' satisfaction with payment terms influencing construction cash flow. Journal of Financial Management of Property and Construction, 10(3), 171–180. doi:10.1108/13664380580001074.
[24] MD ARIS, N., ANUAR, R., Trofimov, I., & Sokat, N. (2019). The Effect of Cash Flows on Firm's Profitability of Construction Sector in Malaysia. UNIMAS Review of Accounting and Finance, 2(1), 31–39. doi:10.33736/uraf.1984.2019.
[25] European Construction Sector Observatory. (2020). Late payment in the construction sector. –Analytical report, European Construction Sector Observatory, European Commission, Brussel, Belgium. Available online: www.buildup.eu/sites/default/ files/content/ecso_ar_late_payment_2020.pdf (accessed on April 2023).
[26] Arnawa, I. M., & Fitriani, N. (2022). Constructing Calculus Concepts through Worksheet Based Problem-Based Learning Assisted by GeoGebra Software. HighTech and Innovation Journal, 3(3), 282-296. doi:10.28991/HIJ-2022-03-03-04
[27] Ye, K. M., & Rahman, H. A. (2010). Risk of late payment in the Malaysian construction industry. International Journal of Mechanical and Industrial Engineering, 4(5), 503-511.
[28] Thomas, H. R., & Flynn, C. J. (2011). Fundamental Principles of Subcontractor Management. Practice Periodical on Structural Design and Construction, 16(3), 106–111. doi:10.1061/(asce)sc.1943-5576.0000087.
[29] Ramachandra, T., & Rotimi, J. O. B. (2015). Causes of payment problems in the New Zealand construction industry. Construction Economics and Building, 15(1), 43–55. doi:10.5130/ajceb.v15i1.4214.
[30] Abdul-Rahman, H., Takim, R., & Min, W. S. (2009). Financial-related causes contributing to project delays. Journal of Retail and Leisure Property, 8(3), 225–238. doi:10.1057/rlp.2009.11.
[31] Abdul-Rahman, H., Kho, M., & Wang, C. (2014). Late payment and nonpayment encountered by contracting firms in a fast-developing economy. Journal of Professional Issues in Engineering Education and Practice, 140(2). doi:10.1061/(ASCE)EI.1943-5541.0000189.
[32] Shiha, A., & Hosny, O. (2019). A multi-objective model for enterprise cash flow management. CSCE Annual Conference, 12-15 June, 2019, Laval, Canada.
[33] Tabyang, W., & Benjaoran, V. (2016). Modified finance-based scheduling model with variable contractor-to-subcontractor payment arrangement. KSCE Journal of Civil Engineering, 20(5), 1621–1630. doi:10.1007/s12205-015-0581-z.
[34] Alavipour, S. M. R., & Arditi, D. (2018). Optimizing Financing Cost in Construction Projects with Fixed Project Duration. Journal of Construction Engineering and Management, 144(4). doi:10.1061/(asce)co.1943-7862.0001451.
[35] Musarat, M. A., Alaloul, W. S., & Liew, M. S. (2022). Inflation rate and labours' wages in construction projects: economic relation investigation. Engineering, Construction and Architectural Management, 29(6), 2461–2494. doi:10.1108/ECAM-07-2020-0478.
[36] Cronk, B. C. (2019). How to use SPSS®: A step-by-step guide to analysis and interpretation (11th Ed.). Routledge, New York, United States. doi:10.4324/9780429340321.
[37] Pallant, J. (2016). SPSS survival manual: A step by step guide to data analysis using IBM SPSS. Routledge, London, United Kingdom. doi:10.4324/9781003117407.
[38] Metts, G., Wayne, I. P. F., Rao, S. S., & Ragu-Nathan, T. S. (2006). Performance measurement in small and medium-sized enterprises: development and testing of a multi-dimensional performance measure. MBAA International Conference Proceedings, 15-17 March, 2006, Chicago, United States.
[39] Adabre, M. A., & Chan, A. P. C. (2019). Critical success factors (CSFs) for sustainable affordable housing. Building and Environment, 156, 203–214. doi:10.1016/j.buildenv.2019.04.030.
[40] Central Bank of Egypt. (2023). Available online: https://www.cbe.org.eg/en/monetary-policy/monetary-policy-publications (accessed on April 2023).
[41] Musarat, M. A., Alaloul, W. S., Qureshi, A. H., & Altaf, M. (2020). Inflation Rate and Construction Materials Prices: Relationship Investigation. 2020 International Conference on Decision Aid Sciences and Application, DASA 2020, 387–390. doi:10.1109/DASA51403.2020.9317162.
[42] Mohamad, H. M., Mohamad, M. I., Saad, I., Bolong, N., Mustazama, J., & Razali, S. N. M. (2021). A case study of s-curve analysis: Causes, effects, tracing and monitoring project extension of time. Civil Engineering Journal (Iran), 7(4), 649–661. doi:10.28991/cej-2021-03091679.
[43] Ncanywa, T., & Setati, N. (2022). The Impact of Inflation Expectations and Public Debt on Taxation in South Africa. IntechOpen. doi:10.5772/intechopen.107389.
[44] Kshaf, D. A., Mohamed, M. A., & El-Dash, K. M. (2022). The major problems between main contractors and subcontractors in construction projects in Egypt. Ain Shams Engineering Journal, 13(6), 101813. doi:10.1016/j.asej.2022.101813.
[45] Peters, E., Subar, K., & Martin, H. (2019). Late Payment and Nonpayment within the Construction Industry: Causes, Effects, and Solutions. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 11(3), 04519013. doi:10.1061/(asce)la.1943-4170.0000314.
[46] Omopariola, E. D., Windapo, A., Edwards, D. J., & Thwala, W. D. (2020). Contractors' perceptions of the effects of cash flow on construction projects. Journal of Engineering, Design and Technology, 18(2), 308–325. doi:10.1108/JEDT-04-2019-0099.
[47] Egyptian Law No. 182. (2018) Regulating Contracts Concluded by Public Entities. Cairo, Egypt. Available online: https://www.ilo.org/dyn/natlex/natlex4.detail?p_isn=112797&p_lang=en. (accessed on March 2023).
[48] Lee, J. K., Han, S. H., Jang, W., & Jung, W. (2018). "Win-win strategy” for sustainable relationship between general contractors and subcontractors in international construction projects. KSCE Journal of Civil Engineering, 22(2), 428–439. doi:10.1007/s12205-017-1613-7.
[49] Tan, Y., Xue, B., & Cheung, Y. T. (2017). Relationships between Main Contractors and Subcontractors and Their Impacts on Main Contractor Competitiveness: An Empirical Study in Hong Kong. Journal of Construction Engineering and Management, 143(7). doi:10.1061/(asce)co.1943-7862.0001311.
[50] Mahamid, I. (2017). Analysis of common factors leading to conflicts between contractors and their subcontractors in building construction projects. Australian Journal of Multi-Disciplinary Engineering, 13(1), 18–28. doi:10.1080/14488388.2017.1342515.
[51] Elazouni, A., Gajpal, Y., & Fares, A. (2023). Negotiating win-win payment terms between construction contractors and subcontractors. Automation in Construction, 146, 104676. doi:10.1016/j.autcon.2022.104676.
- Authors retain all copyrights. It is noticeable that authors will not be forced to sign any copyright transfer agreements.
- This work (including HTML and PDF Files) is licensed under a Creative Commons Attribution 4.0 International License.