Analysis of Launcher's Productivity in Erection Girder Using Time Motion Study Method
Downloads
Doi: 10.28991/CEJ-2023-09-08-06
Full Text: PDF
[2] Prakash, C., Rao, B. P., Shetty, D. V., & Vaibhava, S. (2020). Application of time and motion study to increase the productivity and efficiency. Journal of Physics: Conference Series, 1706(1), 12126. doi:10.1088/1742-6596/1706/1/012126.
[3] Widiantoro, V., Ichsan, M., & Saputra, P. D. (2021). Measurement Analysis of Box Girder Production Cycle Times in Indonesia Infrastructure Projects. Advances in Engineering Research. doi:10.2991/aer.k.210810.002.
[4] Awad, T., Guardiola, J., & Fraíz, D. (2021). Sustainable construction: Improving productivity through lean construction. Sustainability (Switzerland), 13(24), 13877. doi:10.3390/su132413877.
[5] Chauhan, K. A., & Shah, R. A. (2019). Application of Time and Motion for Performance Enhancement of Building Construction Industry. International Journal of Innovative Technology and Exploring Engineering, 8(9S), 980–984. doi:10.35940/ijitee.i1158.0789s19.
[6] Vinod Kumar Reddy, G., & Shyam Chambrelin, K. (2021). Application of Time and Motion study for Brickwork activity in Residential building. IOP Conference Series: Materials Science and Engineering, 1197, 012038. doi:10.1088/1757-899x/1197/1/012038.
[7] Petroutsatou, K., & Kantilierakis, D. (2023). Productivity Analysis and Associated Risks in Steel Structures. Buildings, 13(4), 905. doi:10.3390/buildings13040905.
[8] Guo, X., Golabchi, A., Han, S., & Kanerva, J. (2016). 3D modeling of workplaces for time and motion study of construction labor. In in Proceedings of the 16th International Conference on Computing in Civil and Building Engineering (ICCCBE), Osaka, Japan, 1516-1523.
[9] Montaser, N. M., Mahdi, I. M., Mahdi, H. A., & Rashid, I. A. (2018). Factors Affecting Construction Labor Productivity for Construction of Pre-Stressed Concrete Bridges. International Journal of Construction Engineering and Management, 7(6), 193–206. doi:10.5923/j.ijcem.20180706.01.
[10] Balar, J. H., Rathod, H. A., & Shah, R. (2018). Effective Time, and Motion Study on Construction Project: A Case Study of Surat City'. International Journal for Scientific Research & Development, 6(3), 31-4.
[11] Prakashbhai, P. S., Ankitkumar, P., & Patel, S. (2020). Time and Motion Study of Construction Activities in Industrial Building. International Research Journal of Engineering and Technology, 7(6), 6583–6593.
[12] Fasching, S., Huber, T., Rath, M., & Kollegger, J. (2021). Semi"precast segmental bridges: Development of a new construction method using thin-walled prefabricated concrete elements. Structural Concrete, 22(3), 1561-1573. doi:10.1002/suco.202000474.
[13] Rahmawati, R. (2017). Cost and Time of Erection Girder Work with the Launcher Method in the Middle Span of the Surabaya Mastrip Bridge Construction Project. Applied Final Project, Ten November Institute of Technology, Surabaya, Indonesia. Available online: https://repository.its.ac.id/45449/1/3113041045-Undergraduate_thesis.pdf (accessed on June 2023).
[14] Pratama, D. D., & Adi, T. J. W. (2013). Comparative Analysis of the Erection Girder Method Using Launcher Girder and Temporary Bridge in terms of Cost and Time on the Kali Surabaya Mojokerto Bridge. Jurnal Teknik Pomits, 1(1), 1-10.
[15] Marsudi, M., & Shafeek, H. (2014). Cycle time analysis of tipping trailer frame: A case study in a heavy equipment industry. South African Journal of Industrial Engineering, 25(1), 176–188. doi:10.7166/25-1-636.
[16] Antunes, R., Gonzalez, V. A., Walsh, K., Rojas, O., O'Sullivan, M., & Odeh, I. (2018). Benchmarking project-driven production in construction using productivity function: Capacity and cycle time. Journal of Construction Engineering and Management, 144(3), 04017118. doi:10.1061/(ASCE)CO.1943-7862.0001438.
[17] Sánchez-Garrido, A. J., Navarro, I. J., & Yepes, V. (2022). Multi-criteria decision-making applied to the sustainability of building structures based on Modern Methods of Construction. Journal of Cleaner Production, 330, 129724. doi:10.1016/j.jclepro.2022.131335.
[18] Rully, T., & Rahmawati, N. T. (2015). Planning for Work Measurement in Determining Standard Time Using the Time Study Method to Increase Work Productivity in the Oil Pump Division of PT Bukaka Teknik Utama TBK. JIMFE (Scientific Journal of Management Faculty of Economics), 1(1), 12–18. doi:10.34203/jimfe.v1i1.442. (In Indonesian).
- Authors retain all copyrights. It is noticeable that authors will not be forced to sign any copyright transfer agreements.
- This work (including HTML and PDF Files) is licensed under a Creative Commons Attribution 4.0 International License.