search
  • Home
  • About
    • About the Journal
    • Submissions
    • Editorial Team
    • Author fee(s)
  • Current
  • Archives
  • Editorial Team
  • Contact
  • Register
  • Login
  • Search
logo
  • Register
  • Login
Skip to main content Skip to main navigation menu Skip to site footer
logo
  • Home
  • About
    • About the Journal
    • Submissions
    • Editorial Team
    • Author fee(s)
  • Current
  • Archives
  • Editorial Team
  • Contact
Online ISSN : 2476-3055
Print ISSN : 2676-6957
  1. Home /
  2. Search

Search

Advanced filters
1 - 25 of 85 items 1 2 3 4 > >> 

Integration of Artificial Intelligence Applications and Knowledge Management Processes for Construction Projects Management

DOI : 10.28991/CEJ-2024-010-03-06
Meervat R. Altaie , Marwa M. Dishar
738-756
Abstract : 2033
PDF : 1211
DOI : 10.28991/CEJ-2024-010-03-06

Development of a Framework for Risk-Based Integrated Safety Audit to Enhance Construction Safety Performance

DOI : 10.28991/CEJ-2024-010-03-08
Danang B. Nugroho , Yusuf Latief , Mochamad A. Wibowo , Rosmariani Arifuddin , Fatma Lestari , Muhammad N. Akram
779-795
Abstract : 1602
PDF : 836
DOI : 10.28991/CEJ-2024-010-03-08

Bid Evaluation and Assessment of Innovation in Road Construction Industry: A Systematic Literature Review

DOI : 10.28991/cej-2021-03091646
Pardeep Kumar Oad , Stephen Kajewski , Arun Kumar , Bo Xia
179-196
Abstract : 2068
PDF : 1217
DOI : 10.28991/cej-2021-03091646

Building Information Modeling Strategy in Mitigating Variation Orders in Roads Projects

DOI : 10.28991/cej-2020-03091596
Musab Abuaddous , Ja'far A. Aldiabat Al-Btoosh , Mohammed A. KA. Al-Btoush , Abdulrazzaq Jawish Alkherret
1974-1982
Abstract : 1768
PDF : 1012
DOI : 10.28991/cej-2020-03091596

The Effectiveness of the Procurement at the Construction Services Selection Implementation Center

DOI : 10.28991/CEJ-2024-010-03-013
. Sofian , H. Parung , S. Burhanuddin , R. Arifuddin
847-858
Abstract : 1456
PDF : 763
DOI : 10.28991/CEJ-2024-010-03-013

Safety Risk Assessment Model for Bridge Construction

DOI : 10.28991/CEJ-2025-011-01-010
Widi Hartono , Stefanus A. Kristiawan , Dewi Handayani , Wahyudi Sutopo
161-184
Abstract : 1653
PDF : 653
DOI : 10.28991/CEJ-2025-011-01-010

The Methodology of Using Value Engineering in Construction Projects Management

DOI : 10.28991/cej-030986
Kaveh Miladi Rad , Omid Aminoroayaie Yamini
262-269
Abstract : 6183
PDF : 2295
DOI : 10.28991/cej-030986

The Challenges of Implementing Cognitive Computing in Small Construction Projects: A Data-Driven Perspective

DOI : 10.28991/CEJ-2024-010-09-011
Abdullah Alsehaimi , Khaled A. Alrasheed , Saleh Hayat , Saad Nisar , Omrane Benjeddou
2935-2953
Abstract : 759
PDF : 363
DOI : 10.28991/CEJ-2024-010-09-011

A Circular Framework for Evaluating Highway Construction Projects Success: AHP Approach

DOI : 10.28991/cej-2016-00000037
Ahmed Yousry Akal , Ahmed Ebrahim Abu El-Maaty , Saad Abdel-Karim El-Hamrawy
324-333
Abstract : 2009
PDF : 988
DOI : 10.28991/cej-2016-00000037

Green Construction and Local Wisdom Integration for Sustainability: A Systematic Literature Review

DOI : 10.28991/CEJ-2024-010-11-020
W. Sri Kristinayanti , Yulvi Zaika , Y. Padma Devia , . Solimun , M. Agung Wibowo
3779-3802
Abstract : 1158
PDF : 498
DOI : 10.28991/CEJ-2024-010-11-020

Susceptibility Assessment of Single Gully Debris Flow Based on AHP and Extension Method

DOI : 10.28991/cej-2021-03091702
Qaiser Mehmood , Wang Qing , Jianping Chen , Jianhua Yan , Muhammad Ammar , Gohar Rahman , Nasrullah .
953-973
Abstract : 1564
PDF : 817
DOI : 10.28991/cej-2021-03091702

Design Changes in Construction Projects – Causes and Impact on the Cost

DOI : 10.28991/cej-2019-03091360
Mughees Aslam , Edmund Baffoe-Twum , Farhan Saleem
1647-1655
Abstract : 7760
PDF : 2135
DOI : 10.28991/cej-2019-03091360

Critical Factors for Selecting a Neutral to Support Alternative Dispute Resolution Methods in the Construction Industry

DOI : 10.28991/cej-030965
Abdollah Saeb , Othman Bin Mohamed , Mohd Suhaimi Bin Mohd Danuri , Norhanim Binti Zakaria
11-23
Abstract : 2328
PDF : 1077
DOI : 10.28991/cej-030965

Investigation Study of the Challenges in Green Procurement Implementation in Construction Projects in UAE

DOI : 10.28991/CEJ-2023-09-04-06
Muataz Hazza Al Hazza , Maktoom Muqtadar , Khaled El Salamony , Islam F. Bourini , Ahmad Sakhrieh , Mohammed Alnahhal
849-859
Abstract : 1786
PDF : 1134
DOI : 10.28991/CEJ-2023-09-04-06

The Buildings' Reliability Calculating Method Using a Simple Seismic Impact Model

DOI : 10.28991/CEJ-2024-010-08-019
Vladimir Lapin , Yeraly Shokbarov , Yerken Aldakhov
2734-2744
Abstract : 782
PDF : 410
DOI : 10.28991/CEJ-2024-010-08-019

A Systematic Review of Prerequisites for Constructability Implementation in Infrastructure Projects

DOI : 10.28991/cej-2020-03091493
Rozita Samimpey , Ehsan Saghatforoush
576-590
Abstract : 1966
PDF : 1076
DOI : 10.28991/cej-2020-03091493

Development of Possible Solution to Overcome Factors Influence on Sustainable Construction Process

DOI : 10.28991/cej-2019-03091348
Ryad Tuma Hazem , Hatem Khaleefah Breesam
1506-1517
Abstract : 1371
PDF : 829
DOI : 10.28991/cej-2019-03091348

Effect of Strategic Planning of Human Resources in Management Performance

DOI : 10.28991/CEJ-2022-08-08-014
Ahmad Abujraiban , Gabriel J. Assaf
1725-1738
Abstract : 2436
PDF : 1425
DOI : 10.28991/CEJ-2022-08-08-014

Optimizing Time Performance in Implementing Green Retrofitting on High-Rise Residential by using System Dynamics and M-PERT

DOI : 10.28991/CEJ-2023-09-12-07
Albert E. Husin , Riza S. Prawina , Priyawan Priyawan , Rizkiawan Pangestu , Bernadette D. Kussumardianadewi , Lastarida Sinaga , Kristiyanto Kristiyanto
3060-3074
Abstract : 964
PDF : 636
DOI : 10.28991/CEJ-2023-09-12-07

Evaluating the Impact of Material Selections, Mixing Techniques, and On-site Practices on Performance of Concrete Mixtures

DOI : 10.28991/CEJ-2024-010-02-016
Fadoua Hattani , Bruce Menu , Driss Allaoui , Mustapha Mouflih , Hassan Zanzoun , Hassan Hannache , Bouchaib Manoun
571-598
Abstract : 866
PDF : 580
DOI : 10.28991/CEJ-2024-010-02-016

A Review and Comprehensive Analysis of the Performance of University – Construction Industry Collaboration

DOI : 10.28991/cej-2021-03091688
Ziad Al-Gasim , Aslan Amat Senin , Mohd Effandi bin Yusoff
763-774
Abstract : 1422
PDF : 786
DOI : 10.28991/cej-2021-03091688

Optimization Framework for ASIAN and National Road Networks in Lao PDR Using the Stochastic Markov Model

DOI : 10.28991/CEJ-2025-011-05-023
Souvikhane Hanpasith , Felix Obunguta , Kotaro Sasai , Kiyoyuki Kaito
2134-2149
Abstract : 885
PDF : 315
DOI : 10.28991/CEJ-2025-011-05-023

Experimental and Numerical Analysis of the Behavior of Steel Scaffolding

DOI : 10.28991/CEJ-2025-011-05-014
Florim Grajçevci , Armend Mujaj , Driton Kryeziu , Elfrida Shehu , Zijadin Guri
1969-1979
Abstract : 1039
PDF : 409
DOI : 10.28991/CEJ-2025-011-05-014

Eco-friendly Super Sulphated Cement Concrete Using Vietnam Phosphogypsum and Sodium Carbonate Na2CO3

DOI : 10.28991/CEJ-2022-08-11-06
Ngoc Lam Nguyen , Phuong Le Vu
2445-2460
Abstract : 1430
PDF : 699
DOI : 10.28991/CEJ-2022-08-11-06

The Evaluation of Temporary Shelter Areas Locations Using Geographic Information System and Analytic Hierarchy Process

DOI : 10.28991/cej-03091104
Javad Junian , Valiollah Azizifar
1678-1688
Abstract : 3563
PDF : 1413
DOI : 10.28991/cej-03091104
1 - 25 of 85 items 1 2 3 4 > >> 

Login

Register

Publisher and Affiliated Societies

Publisher

Salehan Institute of Higher Education

 

Society Collaborations

Ital Publication (EUHERA)

 

Indexing & Abstracting

Impact Factor Master Journal List

Scopus

 

SCImago Journal & Country Rank

 

SidebarMenu

  Focus and Scope   Editorial Team   Author Guidelines   Journal Policies   Publication Ethics   Abstracting & Indexing   Open Access Policy   Author(s) Fee

Journal Imprint

Journal Imprint

 

Journal Metrics

Publication Start Year:

2015

JCR 2024 Impact Factor (IF):

4.9

JIF QUARTILE:

Q1

SJR 2024 Quartile:

Q1

Acceptance Rate:

27%

Review Speed (Average):

81 days

Issue Per Year:

12

Number of Volumes:

11

Number of Issues:

119

Number of Articles:

1816

Number of Reviewers:

3624

Number of Contributors:

6178

Contributing Countries:

91

No. of WoS Citations:

7986

Scopus CiteScore:

6.5

No. of Google Citations:

24065

Google h-index:

56

Google i10-index:

804

Abstract Views:

11,481,612

PDF Download:

5,908,793

Last updated: July 02, 2025

Follow us

Follow Us

Most Cited Articles

Heavy Metal Removal Investigation in Conventional Activated Sludge Systems

March 1, 2020
Magdi Buaisha et al.
Vol. 6 No. 3 (2020): March

Modeling of the Solar Thermal Energy Use in Urban Areas

July 1, 2020
Drita Qerimi et al.
Vol. 6 No. 7 (2020): July

Adsorption Behavior of Heavy Metal Ions by Hybrid Inulin-TEOS for Water Treatment

September 1, 2022
Wan Norfazilah Wan Ismail et al.
Vol. 8 No. 9 (2022): September

Application of Tuned Mass Dampers for Structural Vibration Control: A State-of-the-art Review

August 1, 2020
Fatemeh Rahimi et al.
Vol. 6 No. 8 (2020): August

visitors

Analytics

Flag Counter

Web Analytics
View My Stats

Information

  • For Readers
  • For Authors
  • For Librarians

Address

  • Publisher Address: Talar bridge, Babol Road, Ghaemshahr, Mazandaran, Iran.
  • Office Address: Civil Engineering Faculty, K.N.Toosi University of Technology, No. 1346, Vali Asr Street, Tehran, Iran.

Contact Info:

  • Prof. M. R. Kavianpour
  • Principal Contact
  • kavianpour@civilejournal.org
  • Help Desk
  • office@civilejournal.org
CEJ
Copyright © Civil Engineering Journal , All rights reserved. This is an open-access article distributed under the terms of the Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License. Licensed under Creative Commons License a Creative Commons Attribution 4.0 International License. Site using Noble OJS 3 Theme
Themes by Openjournaltheme.com Themes by Openjournaltheme.com Themes by Openjournaltheme.com