search
  • Home
  • About
    • About the Journal
    • Submissions
    • Editorial Team
    • Author fee(s)
  • Current
  • Archives
  • Editorial Team
  • Contact
  • Register
  • Login
  • Search
logo
  • Register
  • Login
Skip to main content Skip to main navigation menu Skip to site footer
logo
  • Home
  • About
    • About the Journal
    • Submissions
    • Editorial Team
    • Author fee(s)
  • Current
  • Archives
  • Editorial Team
  • Contact
Online ISSN : 2476-3055
Print ISSN : 2676-6957
  1. Home /
  2. Search

Search

Advanced filters
1 - 25 of 110 items 1 2 3 4 5 > >> 

Building Information Modeling Strategy in Mitigating Variation Orders in Roads Projects

DOI : 10.28991/cej-2020-03091596
Musab Abuaddous , Ja'far A. Aldiabat Al-Btoosh , Mohammed A. KA. Al-Btoush , Abdulrazzaq Jawish Alkherret
1974-1982
Abstract : 1596
PDF : 886
DOI : 10.28991/cej-2020-03091596

Enhancing Construction Safety Evaluation Through a Standardized Rating Tool System

DOI : 10.28991/CEJ-2025-011-04-016
Danang B. Nugroho , Yusuf Latief , Mochamad A. Wibowo , Rosmariani Arifuddin , Fatma Lestari , Nisrina A. Nurul
1533-1546
Abstract : 536
PDF : 218
DOI : 10.28991/CEJ-2025-011-04-016

Integration of Artificial Intelligence Applications and Knowledge Management Processes for Construction Projects Management

DOI : 10.28991/CEJ-2024-010-03-06
Meervat R. Altaie , Marwa M. Dishar
738-756
Abstract : 1722
PDF : 1000
DOI : 10.28991/CEJ-2024-010-03-06

The Methodology of Using Value Engineering in Construction Projects Management

DOI : 10.28991/cej-030986
Kaveh Miladi Rad , Omid Aminoroayaie Yamini
262-269
Abstract : 5916
PDF : 2149
DOI : 10.28991/cej-030986

Integration of Blockchain-Enabled Smart Contracts in Construction: SWOT Framework and Social Network Analysis

DOI : 10.28991/CEJ-2024-010-05-020
Monica Ghaly , Emad Elbeltagi , Adel Elsmadony , Mohamed A. Tantawy
1662-1697
Abstract : 2379
PDF : 1044
DOI : 10.28991/CEJ-2024-010-05-020

The Challenges of Implementing Cognitive Computing in Small Construction Projects: A Data-Driven Perspective

DOI : 10.28991/CEJ-2024-010-09-011
Abdullah Alsehaimi , Khaled A. Alrasheed , Saleh Hayat , Saad Nisar , Omrane Benjeddou
2935-2953
Abstract : 616
PDF : 280
DOI : 10.28991/CEJ-2024-010-09-011

Critical Construction Readiness Factors for Bridge Projects

DOI : 10.28991/CEJ-SP2024-010-015
Hany Abd Elshakour Mohamed , Anas G. Hasaballah , Adel M. El-Kelesh
291-318
Abstract : 512
PDF : 179
DOI : 10.28991/CEJ-SP2024-010-015

Reviewing of the Simulation Models in Cost Management of the Construction Projects

DOI : 10.28991/cej-2016-00000063
Faiq Mohammed Sarhan Al-Zwainy , Reem Amer , Tareq Khaleel
607-622
Abstract : 2089
PDF : 1051
DOI : 10.28991/cej-2016-00000063

A Circular Framework for Evaluating Highway Construction Projects Success: AHP Approach

DOI : 10.28991/cej-2016-00000037
Ahmed Yousry Akal , Ahmed Ebrahim Abu El-Maaty , Saad Abdel-Karim El-Hamrawy
324-333
Abstract : 1908
PDF : 911
DOI : 10.28991/cej-2016-00000037

Implementation, Advantages and Management of ISO 9001 in the Construction Industry

DOI : 10.28991/cej-2020-03091535
Fazal Ali Shaikh , Samiullah Sohu
1136-1142
Abstract : 2624
PDF : 1207
DOI : 10.28991/cej-2020-03091535

Particle Swarm Optimization Based Approach for Estimation of Costs and Duration of Construction Projects

DOI : 10.28991/cej-2020-03091478
Tarq Zaed Khalaf , Hakan Çağlar , Arzu Çağlar , Ammar Nasiri Hanoon
384-401
Abstract : 1834
PDF : 1019
DOI : 10.28991/cej-2020-03091478

Organizational and Technological Platform for Monolithic Construction Using Pneumatic Formwork

DOI : 10.28991/CEJ-2023-09-11-010
Valery Mishchenko , Azary Lapidus , Dmitry Topchiy , Dmitry Kazakov
2787-2795
Abstract : 642
PDF : 386
DOI : 10.28991/CEJ-2023-09-11-010

Analyzing Engineering-Related Delays Using Quality Function Deployment in Construction Projects

DOI : 10.28991/cej-2020-03091582
Salah Aldeen Salah
1779-1797
Abstract : 1248
PDF : 785
DOI : 10.28991/cej-2020-03091582

Labor Productivity Study in Construction Projects Viewed from Influence Factors

DOI : 10.28991/CEJ-2023-09-03-07
Rusdi U. Latief , N. M. Anditiaman , I. R. Rahim , R. Arifuddin , M. Tumpu
583-595
Abstract : 1666
PDF : 1079
DOI : 10.28991/CEJ-2023-09-03-07

Bid Evaluation and Assessment of Innovation in Road Construction Industry: A Systematic Literature Review

DOI : 10.28991/cej-2021-03091646
Pardeep Kumar Oad , Stephen Kajewski , Arun Kumar , Bo Xia
179-196
Abstract : 1916
PDF : 1123
DOI : 10.28991/cej-2021-03091646

Interaction of Life Cycle Assessment (LCA) and BIM in a Construction Project to Reduce the Environmental Footprint

DOI : 10.28991/CEJ-2025-011-01-08
Cristian C. Osorio-Gómez , Alejandro Alzate-Buitrago , Cristhian C. Amariles-López , Daniel Aristizábal-Torres , Edwin A. Mancilla-Rico
120-130
Abstract : 908
PDF : 430
DOI : 10.28991/CEJ-2025-011-01-08

Structural Equation Modelling (SEM) Approach On Inappropriate Construction Equipment Delay Factors

DOI : 10.28991/cej-2021-03091717
B. Indhu , K. Yogeswari
1156-1168
Abstract : 1592
PDF : 731
DOI : 10.28991/cej-2021-03091717

Investigating Environmental Impact Assessment (EIA) In Early Studies (Zero-Phase) to Prevent Delay in Operation of Construction Projects

DOI : 10.28991/cej-030973
Iraj Jalali , S. Mahammad Poorhashemi , Alireza Mirjalili
117-125
Abstract : 1793
PDF : 766
DOI : 10.28991/cej-030973

Adoption of Prefabrication in Small Scale Construction Projects

DOI : 10.28991/cej-2019-03091314
Shabir Hussain Khahro , Nafees Ahmed Memon , Tauha Hussain Ali , Zubair Ahmed Memon
1099-1104
Abstract : 2133
PDF : 1003
DOI : 10.28991/cej-2019-03091314

Safety Risk Assessment Model for Bridge Construction

DOI : 10.28991/CEJ-2025-011-01-010
Widi Hartono , Stefanus A. Kristiawan , Dewi Handayani , Wahyudi Sutopo
161-184
Abstract : 1149
PDF : 422
DOI : 10.28991/CEJ-2025-011-01-010

Unveiling Effectiveness of Lean Construction Practices: A Comprehensive Study through Surveys and Case Studies

DOI : 10.28991/CEJ-2024-010-04-09
Mughees Aslam , Edmund Baffoe-Twum , Muhammad Ahmed , Aman Ulhaq
1145-1158
Abstract : 1368
PDF : 785
DOI : 10.28991/CEJ-2024-010-04-09

The Impact of Supply Chain Capabilities on Logistic Efficiency for the Construction Projects

DOI : 10.28991/cej-2019-03091329
Muhammad Saeed Shahbaz , Muhammad Afzal Soomro , Nadeem Ul Kareem Bhatti , Zuhairuddin Soomroe , Mir Zafarullah Jamali
1249-1256
Abstract : 1898
PDF : 845
DOI : 10.28991/cej-2019-03091329

Resource Assessment of Limestone Based on Engineering and Petrographic Analysis

DOI : 10.28991/CEJ-2022-08-03-02
Javid Hussain , Jiaming Zhang , Xiao Lina , Khaleel Hussain , Syed Yasir Ali Shah , Sajid Ali , Altaf Hussain
421-437
Abstract : 1679
PDF : 736
DOI : 10.28991/CEJ-2022-08-03-02

Technical Audit and Unethical Practices in the Construction Industry

DOI : 10.28991/CEJ-SP2023-09-014
Medhat A. Youssef , Ahmed H. Ibrahim , Ramy A. Bakry
173-191
Abstract : 816
PDF : 410
DOI : 10.28991/CEJ-SP2023-09-014

A Systematic Review of Prerequisites for Constructability Implementation in Infrastructure Projects

DOI : 10.28991/cej-2020-03091493
Rozita Samimpey , Ehsan Saghatforoush
576-590
Abstract : 1650
PDF : 944
DOI : 10.28991/cej-2020-03091493
1 - 25 of 110 items 1 2 3 4 5 > >> 

Login

Register

Publisher and Affiliated Societies

Publisher & Affiliated Societies

Ital Publication

European High-tech and Emerging Research Association (EUHERA)

 

Indexing & Abstracting

Impact Factor Master Journal List

Scopus

 

SCImago Journal & Country Rank

 

SidebarMenu

  Focus and Scope   Editorial Team   Author Guidelines   Journal Policies   Publication Ethics   Abstracting & Indexing   Open Access Policy   Author(s) Fee

Journal Imprint

Journal Imprint

 

Journal Metrics

Publication Start Year:

2015

JCR 2023 Impact Factor (IF):

4.3

JIF QUARTILE:

Q1

SJR 2023 Quartile:

Q1

Acceptance Rate:

27%

Review Speed (Average):

76 days

Issue Per Year:

12

Number of Volumes:

10

Number of Issues:

107

Number of Articles:

1552

Number of Reviewers:

3417

Number of Contributors:

3604

Contributing Countries:

86

No. of WoS Citations:

7986

WoS h-index:

34

Scopus CiteScore:

7.0

No. of Google Citations:

17324

Google h-index:

47

Google i10-index:

393

Abstract Views:

5,819,908

PDF Download:

3,790,637

Last updated: June 24, 2024

IndexedBy

Indexed In

Follow us

Follow Us

Most Cited Articles

The ITB Unit Hydrograph Method: A Novel Approach to User-Defined Unit Hydrograph Development (Part II)

May 1, 2025
Dantje K. Natakusumah et al.
Vol. 11 No. 5 (2025): May

Sustainable Interlocking Blocks Containing Sugarcane Bagasse Ash: Structural Integrity, Cost Efficiency, and Environmental Benefits

May 1, 2025
Nitirach Sa-nguanduan et al.
Vol. 11 No. 5 (2025): May

Design a No-Fine Concrete Using Epoxy in Pavement

May 1, 2025
Hadel Obaidi et al.
Vol. 11 No. 5 (2025): May

Energy Optimization in Residential Buildings: Evaluating PCM-CLT Wall Systems Across U.S. Climate Zones

May 1, 2025
Amit Deb Nath et al.
Vol. 11 No. 5 (2025): May

Revolutionizing Recycled Aggregate Concrete: A Dual Approach Using HCl Treatment and Silica Fume

May 1, 2025
Wajde S. Alyhya et al.
Vol. 11 No. 5 (2025): May

visitors

Analytics

Flag Counter

Web Analytics
View My Stats

Information

  • For Readers
  • For Authors
  • For Librarians

Address

  • Talar bridge, Babol Road, Ghaemshahr, Mazandaran, Iran

Contact Info:

  • Prof. M. R. Kavianpour
  • Principal Contact
  • kavianpour@civilejournal.org
  • Help Desk
  • office@civilejournal.org
Copyright © Civil Engineering Journal , All rights reserved. This is an open-access article distributed under the terms of the Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License. Licensed under Creative Commons License a Creative Commons Attribution 4.0 International License. Site using Noble OJS 3 Theme
Themes by Openjournaltheme.com Themes by Openjournaltheme.com