search
  • Home
  • About
    • About the Journal
    • Submissions
    • Editorial Team
    • Author fee(s)
  • Current
  • Archives
  • Editorial Team
  • Contact
  • Register
  • Login
  • Search
logo
  • Register
  • Login
Skip to main content Skip to main navigation menu Skip to site footer
logo
  • Home
  • About
    • About the Journal
    • Submissions
    • Editorial Team
    • Author fee(s)
  • Current
  • Archives
  • Editorial Team
  • Contact
Online ISSN : 2476-3055
Print ISSN : 2676-6957
  1. Home /
  2. Search

Search

Advanced filters
1 - 25 of 110 items 1 2 3 4 5 > >> 

Slope Remediation Techniques and Overview of Landslide Risk Management

DOI : 10.28991/cej-2017-00000084
Danish Kazmi , Sadaf Qasim , I.S.H Harahap , Syed Baharom , Mudassir Mehmood , Fahad Irfan Siddiqui , Muhammad Imran
180-189
Abstract : 5867
PDF : 1201
DOI : 10.28991/cej-2017-00000084

Risk Response Selection in Construction Projects

DOI : 10.28991/cej-030950
Hafeth I. Naji , Rouwaida Hussein Ali
1208-1221
Abstract : 3679
PDF : 1343
DOI : 10.28991/cej-030950

Industrial Wastes Risk Ranking with TOPSIS, Multi Criteria Decision Making Method

DOI : 10.28991/cej-2017-00000098
Amirali Pourahmadi , Taghi Ebadi , Manouchehr Nikazar
372-381
Abstract : 1598
PDF : 773
DOI : 10.28991/cej-2017-00000098

The Influence of Customer Relationships on Supply Chain Risk Mitigation in International Logistics

DOI : 10.28991/CEJ-2024-010-06-010
Muhammad Ilyas , Zhihong Jin , Irfan Ullah , Qasim Zaheer , Waiss Ali Aden
1874-1889
Abstract : 1372
PDF : 538
DOI : 10.28991/CEJ-2024-010-06-010

Safety Risk Assessment Model for Bridge Construction

DOI : 10.28991/CEJ-2025-011-01-010
Widi Hartono , Stefanus A. Kristiawan , Dewi Handayani , Wahyudi Sutopo
161-184
Abstract : 1149
PDF : 422
DOI : 10.28991/CEJ-2025-011-01-010

The Risk Assessment of Dam Construction Projects Using Fuzzy TOPSIS (Case Study: Alavian Earth Dam)

DOI : 10.28991/cej-2016-00000022
Sina Shaffiee Haghshenas , Mir Ahmad Lashteh Neshaei , Pouyan Pourkazem , Sami Shaffiee Haghshenas
158-167
Abstract : 4602
PDF : 1647
DOI : 10.28991/cej-2016-00000022

Fuzzy Bayesian Belief Networks Method on Risk Assessment of EPC Pipeline Project

DOI : 10.28991/CEJ-2025-011-03-013
Muhammad Yusuf , Yusuf Latief , Ayomi Dita Rarasati , Bambang Trigunarsyah , Naufal Budi Laksono
1050-1071
Abstract : 717
PDF : 402
DOI : 10.28991/CEJ-2025-011-03-013

A Hybrid Fuzzy TOPSIS – Best Worst Method for Risk Prioritization in Megaprojects

DOI : 10.28991/cej-2019-03091330
Ashraf Norouzi , Hamid Ghayur Namin
1257-1272
Abstract : 2750
PDF : 1224
DOI : 10.28991/cej-2019-03091330

Analysis of the Schedule Risk of Prefabricated Buildings Based on ISM and Research of Transfer Path

DOI : 10.28991/CEJ-2022-08-01-010
Xiaobo Shi , Chenchen Liu , Wanying Liu , Fang Shen , Jiayan Chen , Kunkun Ma
134-144
Abstract : 1333
PDF : 766
DOI : 10.28991/CEJ-2022-08-01-010

Utilization of Soft Computing for Risk Assessment of a Tunneling Project Using Geological Units

DOI : 10.28991/cej-2016-00000040
Sina Shaffiee Haghshenas , Sami Shaffiee Haghshenas , Milad Barmal , Niloofar Farzan
358-364
Abstract : 2605
PDF : 987
DOI : 10.28991/cej-2016-00000040

Risk-Based Method-Technology Integration on Spun Pile Production for Product and Service Quality

DOI : 10.28991/CEJ-2024-010-11-015
Ranti Hidayawanti , Yusuf Latief , Vincent Gaspersz
3683-3698
Abstract : 413
PDF : 249
DOI : 10.28991/CEJ-2024-010-11-015

Enhancing Risk Assessment in Toll Road Operations: A Hybrid Rough Delphi-Rough DEMATEL Approach

DOI : 10.28991/CEJ-2023-09-09-03
G. Ardi Pratama , Y. Latief , Bambang Trigunarsyah , L. Sagita Riantini , Lukas Beladi Sihombing
2130-2144
Abstract : 1118
PDF : 696
DOI : 10.28991/CEJ-2023-09-09-03

Risks of Surface Water Pollution in Southern Vietnam

DOI : 10.28991/CEJ-2023-09-11-06
Giao Thanh Nguyen , Dan Hoang Truong
2725-2735
Abstract : 1058
PDF : 548
DOI : 10.28991/CEJ-2023-09-11-06

Pollution and Risk Level Assessment of Pollutants in Surface Water Bodies

DOI : 10.28991/CEJ-2023-09-08-03
Giao Thanh Nguyen , Mi Le Thi Diem , Nhien Thi Hong Huynh
1851-1862
Abstract : 1265
PDF : 697
DOI : 10.28991/CEJ-2023-09-08-03

Utilizing Remote Sensing and GIS Techniques for Flood Hazard Mapping and Risk Assessment

DOI : 10.28991/CEJ-2024-010-05-05
Aslam A. Al-Omari , Nawras N. Shatnawi , Nadim I. Shbeeb , Denis Istrati , Nikos D. Lagaros , Khairedin M. Abdalla
1423-1436
Abstract : 2470
PDF : 996
DOI : 10.28991/CEJ-2024-010-05-05

An Assessment of Nature-Based Solutions Water Infrastructure for Flood Risk Reduction in Unplanned Area

DOI : 10.28991/CEJ-2025-011-05-07
Maman Supratman , Muhammad S. Badri Kusuma , Muhammad Cahyono , Arno Adi Kuntoro
1827-1855
Abstract : 529
PDF : 207
DOI : 10.28991/CEJ-2025-011-05-07

An Evaluation of Barriers obstructing the Applicability of Public Private Partnership (PPP) in Infrastructure Development

DOI : 10.28991/cej-2019-03091439
Sedqi Esmaeel Rezouki , Jinan Kata'a Hassan
2643-2664
Abstract : 1471
PDF : 722
DOI : 10.28991/cej-2019-03091439

Designing Human Health Risk Management Model for Dam Construction Projects

DOI : 10.28991/cej-03091148
R. Ghorbanalipour , AM. Ahmadvand , M. Ahmadvand , H. Eghbali
2173-2185
Abstract : 1375
PDF : 771
DOI : 10.28991/cej-03091148

Determining the Causes of Punching Shear in Reinforced Slabs Using Fishbone Diagram

DOI : 10.28991/cej-03091188
Abbas Mohammed Burhan , Meervat R. Altaie , Omer K. Al-Kubaisi
2642-2651
Abstract : 2294
PDF : 831
DOI : 10.28991/cej-03091188

Risk Assessment of Geological Hazards in a Tunneling Project Using Harmony Search Algorithm (Case Study: Ardabil-Mianeh Railway Tunnel)

DOI : 10.28991/cej-2016-00000057
Reza Mikaeil , Sina Shaffiee Haghshenas , Yakob Shirvand , Mehdi Valizadeh Hasanluy , Vali Roshanaei
546-554
Abstract : 2925
PDF : 1157
DOI : 10.28991/cej-2016-00000057

Risk-Reduction Credit for Very Early Warning Fire Detection at Nuclear Power Plants: From FAQ to Fiction

DOI : 10.28991/cej-2019-03091246
Raymond HV Gallucci
309-319
Abstract : 1368
PDF : 719
DOI : 10.28991/cej-2019-03091246

Discovering an Orphan Source of Ionizing Radiation with Respect to Occupational Safety and Health

DOI : 10.28991/CEJ-2022-08-11-013
Miroslav Tomek , Jan Strohmandl , Pavel Tomášek , Dušan Vičar
2548-2559
Abstract : 822
PDF : 488
DOI : 10.28991/CEJ-2022-08-11-013

Characterization of Groundwater Quality and Human Health Risk Assessment

DOI : 10.28991/CEJ-2023-09-03-09
Thanh Giao Nguyen , Nhien Thi Hong Huynh
618-628
Abstract : 2034
PDF : 1032
DOI : 10.28991/CEJ-2023-09-03-09

Fatigue Resistance Models of Structural for Risk Based Inspection

DOI : 10.28991/cej-2020-03091477
Sergei Belodedenko , V. Hanush , A. Baglay , О. Hrechanyі
375-383
Abstract : 1082
PDF : 650
DOI : 10.28991/cej-2020-03091477

Construction Project Delay Risk Assessment Based on 4M1E Framework and Afghanistan Situation

DOI : 10.28991/CEJ-2024-010-01-06
Hijratullah Sharifzada , Yu Deming
100-116
Abstract : 1277
PDF : 718
DOI : 10.28991/CEJ-2024-010-01-06
1 - 25 of 110 items 1 2 3 4 5 > >> 

Login

Register

Publisher and Affiliated Societies

Publisher & Affiliated Societies

Ital Publication

European High-tech and Emerging Research Association (EUHERA)

 

Indexing & Abstracting

Impact Factor Master Journal List

Scopus

 

SCImago Journal & Country Rank

 

SidebarMenu

  Focus and Scope   Editorial Team   Author Guidelines   Journal Policies   Publication Ethics   Abstracting & Indexing   Open Access Policy   Author(s) Fee

Journal Imprint

Journal Imprint

 

Journal Metrics

Publication Start Year:

2015

JCR 2023 Impact Factor (IF):

4.3

JIF QUARTILE:

Q1

SJR 2023 Quartile:

Q1

Acceptance Rate:

27%

Review Speed (Average):

76 days

Issue Per Year:

12

Number of Volumes:

10

Number of Issues:

107

Number of Articles:

1552

Number of Reviewers:

3417

Number of Contributors:

3604

Contributing Countries:

86

No. of WoS Citations:

7986

WoS h-index:

34

Scopus CiteScore:

7.0

No. of Google Citations:

17324

Google h-index:

47

Google i10-index:

393

Abstract Views:

5,819,908

PDF Download:

3,790,637

Last updated: June 24, 2024

IndexedBy

Indexed In

social

Follow Us

LinkedIn  RG  Google Scholar  Academia

Journal Imprint

Indexing and Abstracting

Impact Factor Master Journal List

Scopus

SCImago Journal & Country Rank

Civil Engineering Journal is now the member of Committee on Publication Ethics (COPE).

Open Access Journal

Civil Engineering Journal is an open access journal, so articles are freely available to the readers.

Journal Metrics

Publication Start Year:

2015

JCR 2023 Impact Factor (IF):

4.3

JIF QUARTILE:

Q1

SJR 2023 Quartile:

Q1

Acceptance Rate:

27%

Review Speed (Average):

76 days

Issue Per Year:

12

Number of Volumes:

10

Number of Issues:

107

Number of Articles:

1552

Number of Reviewers:

3417

Number of Contributors:

3604

Contributing Countries:

86

No. of WoS Citations:

7986

WoS h-index:

34

Scopus CiteScore:

7.0

No. of Google Citations:

17324

Google h-index:

47

Google i10-index:

393

Abstract Views:

5,819,908

PDF Download:

3,790,637

Last updated: June 24, 2024

Most Cited Articles

The ITB Unit Hydrograph Method: A Novel Approach to User-Defined Unit Hydrograph Development (Part II)

May 1, 2025
Dantje K. Natakusumah et al.
Vol. 11 No. 5 (2025): May

Sustainable Interlocking Blocks Containing Sugarcane Bagasse Ash: Structural Integrity, Cost Efficiency, and Environmental Benefits

May 1, 2025
Nitirach Sa-nguanduan et al.
Vol. 11 No. 5 (2025): May

Design a No-Fine Concrete Using Epoxy in Pavement

May 1, 2025
Hadel Obaidi et al.
Vol. 11 No. 5 (2025): May

Energy Optimization in Residential Buildings: Evaluating PCM-CLT Wall Systems Across U.S. Climate Zones

May 1, 2025
Amit Deb Nath et al.
Vol. 11 No. 5 (2025): May

Revolutionizing Recycled Aggregate Concrete: A Dual Approach Using HCl Treatment and Silica Fume

May 1, 2025
Wajde S. Alyhya et al.
Vol. 11 No. 5 (2025): May

visitors

Visitors

Flag Counter
Web Analytics Made Easy - Statcounter View My Stats
Themes by Openjournaltheme.com Themes by Openjournaltheme.com