search
  • Home
  • About
    • About the Journal
    • Submissions
    • Editorial Team
    • Author fee(s)
  • Current
  • Archives
  • Editorial Team
  • Contact
  • Register
  • Login
  • Search
logo
  • Register
  • Login
Skip to main content Skip to main navigation menu Skip to site footer
logo
  • Home
  • About
    • About the Journal
    • Submissions
    • Editorial Team
    • Author fee(s)
  • Current
  • Archives
  • Editorial Team
  • Contact
Online ISSN : 2476-3055
Print ISSN : 2676-6957
  1. Home /
  2. Search

Search

Advanced filters
1 - 25 of 27 items 1 2 > >> 

BIM Adoption in MENA's Construction Industry: A Contractor's Perspective

DOI : 10.28991/CEJ-2024-010-08-015
Mohammad Sadeq Abdullah , Mohamed Salem , Salah Omar Said , Mohamed Tantawy
2661-2676
Abstract : 1320
PDF : 661
DOI : 10.28991/CEJ-2024-010-08-015

Critical Construction Readiness Factors for Bridge Projects

DOI : 10.28991/CEJ-SP2024-010-015
Hany Abd Elshakour Mohamed , Anas G. Hasaballah , Adel M. El-Kelesh
291-318
Abstract : 645
PDF : 271
DOI : 10.28991/CEJ-SP2024-010-015

Determining Root Cause of Construction Waste Generation: A Global Context

DOI : 10.28991/cej-03091179
Suaathi Kaliannan , Sasitharan Nagapan , Abd Halid Abdullah , Samiullah Sohu , Ashfaque Ahmed Jhatial
2539-2547
Abstract : 4535
PDF : 1909
DOI : 10.28991/cej-03091179

Design Changes in Construction Projects – Causes and Impact on the Cost

DOI : 10.28991/cej-2019-03091360
Mughees Aslam , Edmund Baffoe-Twum , Farhan Saleem
1647-1655
Abstract : 7656
PDF : 2078
DOI : 10.28991/cej-2019-03091360

Construction Project Delay Risk Assessment Based on 4M1E Framework and Afghanistan Situation

DOI : 10.28991/CEJ-2024-010-01-06
Hijratullah Sharifzada , Yu Deming
100-116
Abstract : 1464
PDF : 846
DOI : 10.28991/CEJ-2024-010-01-06

Analyzing Engineering-Related Delays Using Quality Function Deployment in Construction Projects

DOI : 10.28991/cej-2020-03091582
Salah Aldeen Salah
1779-1797
Abstract : 1318
PDF : 869
DOI : 10.28991/cej-2020-03091582

A Systematic Review of Prerequisites for Constructability Implementation in Infrastructure Projects

DOI : 10.28991/cej-2020-03091493
Rozita Samimpey , Ehsan Saghatforoush
576-590
Abstract : 1845
PDF : 1041
DOI : 10.28991/cej-2020-03091493

Lean Construction Practice on Toll Road Project Improvement: A Case Study in Developing Country

DOI : 10.28991/CEJ-2023-09-12-016
Mohammed Ali Berawi , Mustika Sari , Perdana Miraj , . Mardiansyah , Gunawan Saroji , Bambang Susantono
3186-3201
Abstract : 1862
PDF : 1021
DOI : 10.28991/CEJ-2023-09-12-016

Technical Audit and Unethical Practices in the Construction Industry

DOI : 10.28991/CEJ-SP2023-09-014
Medhat A. Youssef , Ahmed H. Ibrahim , Ramy A. Bakry
173-191
Abstract : 941
PDF : 483
DOI : 10.28991/CEJ-SP2023-09-014

Adoptability of Lean Construction Techniques in Pakistan's Construction Industry

DOI : 10.28991/cej-03091162
Aftab Hameed Memon , Muhammad Akram Akhund , Abdul Nasir Laghari , Hafiz Usama Imad , Shadab Noor Bhangwar
2328-2337
Abstract : 2135
PDF : 921
DOI : 10.28991/cej-03091162

Evaluating the Existing Barriers in Implementing Constructability

DOI : 10.28991/cej-03091204
Samereh Jadidoleslami , Ehsan Saghatforoush , Amirhossein Heravi , Christopher Preece
2864-2875
Abstract : 1491
PDF : 909
DOI : 10.28991/cej-03091204

Delay Factors in Building Construction Project of State Elementary School

DOI : 10.28991/cej-2020-03091488
Raden Risang Haryo C. D. , Lalu Mulyadi , Tiong Iskandar
523-530
Abstract : 1594
PDF : 855
DOI : 10.28991/cej-2020-03091488

Investigating Factors of Safety Culture Assessment in Construction Industry Projects

DOI : 10.28991/cej-2019-03091304
Vahid Zeinalabedin Tehrani , Omid Rezaifar , Majid Gholhaki , Yahya Khosravi
971-983
Abstract : 2220
PDF : 1132
DOI : 10.28991/cej-2019-03091304

A Case Study of S-Curve Analysis: Causes, Effects, Tracing and Monitoring Project Extension of Time

DOI : 10.28991/cej-2021-03091679
Habib Musa Mohamad , Mohamad Ibrahim Mohamad , Ismail Saad , Nurmin Bolong , J. Mustazama , Siti Nooraiin Mohd Razali
649-661
Abstract : 2943
PDF : 1319
DOI : 10.28991/cej-2021-03091679

Procurement of Railway Infrastructure Projects – A European Benchmarking Study

DOI : 10.28991/cej-2017-00000086
Per Erik Eriksson , Sofia Lingegård , Lena Borg , Johan Nyström
199-213
Abstract : 4023
PDF : 1780
DOI : 10.28991/cej-2017-00000086

Modelling the Implications of Delayed Payments on Contractors' Cashflows on Infrastructure Projects

DOI : 10.28991/CEJ-2023-09-01-05
Aaron Chadee , Hanna Ali , Sihara Gallage , Upaka Rathnayake
52-71
Abstract : 2755
PDF : 1419
DOI : 10.28991/CEJ-2023-09-01-05

Impact Factors on Subcontractor's Cash Flow Management

DOI : 10.28991/CEJ-SP2023-09-08
Medhat A. Youssef , Ahmed H. Ibrahim , M. El-Sayed El-Badawy Hafez
94-104
Abstract : 1112
PDF : 646
DOI : 10.28991/CEJ-SP2023-09-08

Modeling the Completion Time of Public School Building Projects Using Neural Networks

DOI : 10.28991/cej-030956
Zeyad S. M. Khaled , Raid S. Abid Ali , Musaab Falih Hasan
1266-1277
Abstract : 1406
PDF : 719
DOI : 10.28991/cej-030956

Stakeholders' Perception on Critical Cost Variation Factors in Malaysian Building Projects

DOI : 10.28991/cej-03091140
Samiullah Sohu , Abd Halid Abdullah , Sasitharan Nagapan , Ahsan Ali Buriro , Kaleemullah Kaleemullah
2075-2081
Abstract : 1539
PDF : 727
DOI : 10.28991/cej-03091140

New Rethinking on Managers' Competency Criteria and Success Factors in Airport Construction Projects

DOI : 10.28991/cej-03091192
Alireza Roshani , Mohsen Gerami , Omid Rezaeifar
2692-2701
Abstract : 1460
PDF : 763
DOI : 10.28991/cej-03091192

Behavioral Differences Towards Internal and External Factors in Making the Bid/No Bid Decision

DOI : 10.28991/cej-2019-03091323
Abdulrahman Bageis , Ibrahim I. Falqi , Abdullah Alshehri , Saleh Alsulamy , Tariq A. Alsahli
1189-1196
Abstract : 2097
PDF : 900
DOI : 10.28991/cej-2019-03091323

Development of a Prediction System for Design Defects of Buildings

DOI : 10.28991/CEJ-SP2023-09-017
Ahmed Nouh , El-Sayed El-Kasaby , Khaled Aboulata
217-235
Abstract : 550
PDF : 362
DOI : 10.28991/CEJ-SP2023-09-017

Exploring the Challenges of Financing Iran's Construction Projects from China and Providing Improvement Solutions

DOI : 10.28991/cej-03091105
Musa Hajiani , Mojtaba Azizi , Ehsanollah Eshtehardian , Kazem Naseh
1689-1701
Abstract : 2137
PDF : 868
DOI : 10.28991/cej-03091105

Assessment of Change Orders Attributes in Preconstruction and Construction Phase

DOI : 10.28991/cej-2019-03091273
Ali Raza Khoso , Jam Shahzaib Khan , Rizwan Ullah Faiz , Muhammad Akram Akhund
616-623
Abstract : 1544
PDF : 971
DOI : 10.28991/cej-2019-03091273

Risk Response Selection in Construction Projects

DOI : 10.28991/cej-030950
Hafeth I. Naji , Rouwaida Hussein Ali
1208-1221
Abstract : 3793
PDF : 1401
DOI : 10.28991/cej-030950
1 - 25 of 27 items 1 2 > >> 

Login

Register

Publisher and Affiliated Societies

Publisher

Salehan Institute of Higher Education

 

Society Collaborations

Ital Publication (EUHERA)

 

Indexing & Abstracting

Impact Factor Master Journal List

Scopus

 

SCImago Journal & Country Rank

 

SidebarMenu

  Focus and Scope   Editorial Team   Author Guidelines   Journal Policies   Publication Ethics   Abstracting & Indexing   Open Access Policy   Author(s) Fee

Journal Imprint

Journal Imprint

 

Journal Metrics

Publication Start Year:

2015

JCR 2024 Impact Factor (IF):

4.9

JIF QUARTILE:

Q1

SJR 2024 Quartile:

Q1

Acceptance Rate:

27%

Review Speed (Average):

81 days

Issue Per Year:

12

Number of Volumes:

11

Number of Issues:

119

Number of Articles:

1816

Number of Reviewers:

3624

Number of Contributors:

6178

Contributing Countries:

91

No. of WoS Citations:

7986

Scopus CiteScore:

6.5

No. of Google Citations:

24065

Google h-index:

56

Google i10-index:

804

Abstract Views:

11,481,612

PDF Download:

5,908,793

Last updated: July 02, 2025

Follow us

Follow Us

Most Cited Articles

Heavy Metal Removal Investigation in Conventional Activated Sludge Systems

March 1, 2020
Magdi Buaisha et al.
Vol. 6 No. 3 (2020): March

Modeling of the Solar Thermal Energy Use in Urban Areas

July 1, 2020
Drita Qerimi et al.
Vol. 6 No. 7 (2020): July

Adsorption Behavior of Heavy Metal Ions by Hybrid Inulin-TEOS for Water Treatment

September 1, 2022
Wan Norfazilah Wan Ismail et al.
Vol. 8 No. 9 (2022): September

Application of Tuned Mass Dampers for Structural Vibration Control: A State-of-the-art Review

August 1, 2020
Fatemeh Rahimi et al.
Vol. 6 No. 8 (2020): August

visitors

Analytics

Flag Counter

Web Analytics
View My Stats

Information

  • For Readers
  • For Authors
  • For Librarians

Address

  • Publisher Address: Talar bridge, Babol Road, Ghaemshahr, Mazandaran, Iran.
  • Office Address: Civil Engineering Faculty, K.N.Toosi University of Technology, No. 1346, Vali Asr Street, Tehran, Iran.

Contact Info:

  • Prof. M. R. Kavianpour
  • Principal Contact
  • kavianpour@civilejournal.org
  • Help Desk
  • office@civilejournal.org
CEJ
Copyright © Civil Engineering Journal , All rights reserved. This is an open-access article distributed under the terms of the Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License. Licensed under Creative Commons License a Creative Commons Attribution 4.0 International License. Site using Noble OJS 3 Theme
Themes by Openjournaltheme.com Themes by Openjournaltheme.com