search
  • Home
  • About
    • About the Journal
    • Submissions
    • Author fee(s)
  • Current
  • Archives
  • Editorial Team
  • Contact
  • Register
  • Login
  • Search
logo
  • Register
  • Login
Skip to main content Skip to main navigation menu Skip to site footer
logo
  • Home
  • About
    • About the Journal
    • Submissions
    • Author fee(s)
  • Current
  • Archives
  • Editorial Team
  • Contact
Online ISSN : 2476-3055
Print ISSN : 2676-6957
  1. Home /
  2. Search

Search

Advanced filters
1 - 25 of 110 items 1 2 3 4 5 > >> 

Slope Remediation Techniques and Overview of Landslide Risk Management

DOI : 10.28991/cej-2017-00000084
Danish Kazmi , Sadaf Qasim , I.S.H Harahap , Syed Baharom , Mudassir Mehmood , Fahad Irfan Siddiqui , Muhammad Imran
180-189
Abstract : 5870
PDF : 1202
DOI : 10.28991/cej-2017-00000084

Risk Response Selection in Construction Projects

DOI : 10.28991/cej-030950
Hafeth I. Naji , Rouwaida Hussein Ali
1208-1221
Abstract : 3680
PDF : 1343
DOI : 10.28991/cej-030950

Industrial Wastes Risk Ranking with TOPSIS, Multi Criteria Decision Making Method

DOI : 10.28991/cej-2017-00000098
Amirali Pourahmadi , Taghi Ebadi , Manouchehr Nikazar
372-381
Abstract : 1598
PDF : 773
DOI : 10.28991/cej-2017-00000098

The Influence of Customer Relationships on Supply Chain Risk Mitigation in International Logistics

DOI : 10.28991/CEJ-2024-010-06-010
Muhammad Ilyas , Zhihong Jin , Irfan Ullah , Qasim Zaheer , Waiss Ali Aden
1874-1889
Abstract : 1374
PDF : 538
DOI : 10.28991/CEJ-2024-010-06-010

The Risk Assessment of Dam Construction Projects Using Fuzzy TOPSIS (Case Study: Alavian Earth Dam)

DOI : 10.28991/cej-2016-00000022
Sina Shaffiee Haghshenas , Mir Ahmad Lashteh Neshaei , Pouyan Pourkazem , Sami Shaffiee Haghshenas
158-167
Abstract : 4603
PDF : 1647
DOI : 10.28991/cej-2016-00000022

Safety Risk Assessment Model for Bridge Construction

DOI : 10.28991/CEJ-2025-011-01-010
Widi Hartono , Stefanus A. Kristiawan , Dewi Handayani , Wahyudi Sutopo
161-184
Abstract : 1149
PDF : 422
DOI : 10.28991/CEJ-2025-011-01-010

Fuzzy Bayesian Belief Networks Method on Risk Assessment of EPC Pipeline Project

DOI : 10.28991/CEJ-2025-011-03-013
Muhammad Yusuf , Yusuf Latief , Ayomi Dita Rarasati , Bambang Trigunarsyah , Naufal Budi Laksono
1050-1071
Abstract : 719
PDF : 404
DOI : 10.28991/CEJ-2025-011-03-013

A Hybrid Fuzzy TOPSIS – Best Worst Method for Risk Prioritization in Megaprojects

DOI : 10.28991/cej-2019-03091330
Ashraf Norouzi , Hamid Ghayur Namin
1257-1272
Abstract : 2750
PDF : 1224
DOI : 10.28991/cej-2019-03091330

Analysis of the Schedule Risk of Prefabricated Buildings Based on ISM and Research of Transfer Path

DOI : 10.28991/CEJ-2022-08-01-010
Xiaobo Shi , Chenchen Liu , Wanying Liu , Fang Shen , Jiayan Chen , Kunkun Ma
134-144
Abstract : 1334
PDF : 766
DOI : 10.28991/CEJ-2022-08-01-010

Utilization of Soft Computing for Risk Assessment of a Tunneling Project Using Geological Units

DOI : 10.28991/cej-2016-00000040
Sina Shaffiee Haghshenas , Sami Shaffiee Haghshenas , Milad Barmal , Niloofar Farzan
358-364
Abstract : 2606
PDF : 987
DOI : 10.28991/cej-2016-00000040

Risk-Based Method-Technology Integration on Spun Pile Production for Product and Service Quality

DOI : 10.28991/CEJ-2024-010-11-015
Ranti Hidayawanti , Yusuf Latief , Vincent Gaspersz
3683-3698
Abstract : 414
PDF : 249
DOI : 10.28991/CEJ-2024-010-11-015

Enhancing Risk Assessment in Toll Road Operations: A Hybrid Rough Delphi-Rough DEMATEL Approach

DOI : 10.28991/CEJ-2023-09-09-03
G. Ardi Pratama , Y. Latief , Bambang Trigunarsyah , L. Sagita Riantini , Lukas Beladi Sihombing
2130-2144
Abstract : 1120
PDF : 696
DOI : 10.28991/CEJ-2023-09-09-03

Risks of Surface Water Pollution in Southern Vietnam

DOI : 10.28991/CEJ-2023-09-11-06
Giao Thanh Nguyen , Dan Hoang Truong
2725-2735
Abstract : 1062
PDF : 548
DOI : 10.28991/CEJ-2023-09-11-06

Pollution and Risk Level Assessment of Pollutants in Surface Water Bodies

DOI : 10.28991/CEJ-2023-09-08-03
Giao Thanh Nguyen , Mi Le Thi Diem , Nhien Thi Hong Huynh
1851-1862
Abstract : 1267
PDF : 698
DOI : 10.28991/CEJ-2023-09-08-03

Utilizing Remote Sensing and GIS Techniques for Flood Hazard Mapping and Risk Assessment

DOI : 10.28991/CEJ-2024-010-05-05
Aslam A. Al-Omari , Nawras N. Shatnawi , Nadim I. Shbeeb , Denis Istrati , Nikos D. Lagaros , Khairedin M. Abdalla
1423-1436
Abstract : 2471
PDF : 996
DOI : 10.28991/CEJ-2024-010-05-05

An Assessment of Nature-Based Solutions Water Infrastructure for Flood Risk Reduction in Unplanned Area

DOI : 10.28991/CEJ-2025-011-05-07
Maman Supratman , Muhammad S. Badri Kusuma , Muhammad Cahyono , Arno Adi Kuntoro
1827-1855
Abstract : 539
PDF : 212
DOI : 10.28991/CEJ-2025-011-05-07

An Evaluation of Barriers obstructing the Applicability of Public Private Partnership (PPP) in Infrastructure Development

DOI : 10.28991/cej-2019-03091439
Sedqi Esmaeel Rezouki , Jinan Kata'a Hassan
2643-2664
Abstract : 1472
PDF : 725
DOI : 10.28991/cej-2019-03091439

Designing Human Health Risk Management Model for Dam Construction Projects

DOI : 10.28991/cej-03091148
R. Ghorbanalipour , AM. Ahmadvand , M. Ahmadvand , H. Eghbali
2173-2185
Abstract : 1376
PDF : 772
DOI : 10.28991/cej-03091148

Risk Assessment of Geological Hazards in a Tunneling Project Using Harmony Search Algorithm (Case Study: Ardabil-Mianeh Railway Tunnel)

DOI : 10.28991/cej-2016-00000057
Reza Mikaeil , Sina Shaffiee Haghshenas , Yakob Shirvand , Mehdi Valizadeh Hasanluy , Vali Roshanaei
546-554
Abstract : 2925
PDF : 1157
DOI : 10.28991/cej-2016-00000057

Risk-Reduction Credit for Very Early Warning Fire Detection at Nuclear Power Plants: From FAQ to Fiction

DOI : 10.28991/cej-2019-03091246
Raymond HV Gallucci
309-319
Abstract : 1369
PDF : 720
DOI : 10.28991/cej-2019-03091246

Determining the Causes of Punching Shear in Reinforced Slabs Using Fishbone Diagram

DOI : 10.28991/cej-03091188
Abbas Mohammed Burhan , Meervat R. Altaie , Omer K. Al-Kubaisi
2642-2651
Abstract : 2295
PDF : 832
DOI : 10.28991/cej-03091188

Discovering an Orphan Source of Ionizing Radiation with Respect to Occupational Safety and Health

DOI : 10.28991/CEJ-2022-08-11-013
Miroslav Tomek , Jan Strohmandl , Pavel Tomášek , Dušan Vičar
2548-2559
Abstract : 823
PDF : 488
DOI : 10.28991/CEJ-2022-08-11-013

Characterization of Groundwater Quality and Human Health Risk Assessment

DOI : 10.28991/CEJ-2023-09-03-09
Thanh Giao Nguyen , Nhien Thi Hong Huynh
618-628
Abstract : 2036
PDF : 1032
DOI : 10.28991/CEJ-2023-09-03-09

Fatigue Resistance Models of Structural for Risk Based Inspection

DOI : 10.28991/cej-2020-03091477
Sergei Belodedenko , V. Hanush , A. Baglay , О. Hrechanyі
375-383
Abstract : 1083
PDF : 651
DOI : 10.28991/cej-2020-03091477

Construction Project Delay Risk Assessment Based on 4M1E Framework and Afghanistan Situation

DOI : 10.28991/CEJ-2024-010-01-06
Hijratullah Sharifzada , Yu Deming
100-116
Abstract : 1278
PDF : 718
DOI : 10.28991/CEJ-2024-010-01-06
1 - 25 of 110 items 1 2 3 4 5 > >> 

Login

Register

Publisher and Affiliated Societies

Publisher & Affiliated Societies

Salehan Institute of Higher Education

 

Indexing & Abstracting

Impact Factor Master Journal List

Scopus

 

SCImago Journal & Country Rank

 

SidebarMenu

  Focus and Scope   Editorial Team   Author Guidelines   Journal Policies   Publication Ethics   Abstracting & Indexing   Open Access Policy   Author(s) Fee

Journal Imprint

Journal Imprint

 

Journal Metrics

Publication Start Year:

2015

JCR 2023 Impact Factor (IF):

4.3

JIF QUARTILE:

Q1

SJR 2023 Quartile:

Q1

Acceptance Rate:

27%

Review Speed (Average):

76 days

Issue Per Year:

12

Number of Volumes:

10

Number of Issues:

107

Number of Articles:

1552

Number of Reviewers:

3417

Number of Contributors:

3604

Contributing Countries:

86

No. of WoS Citations:

7986

WoS h-index:

34

Scopus CiteScore:

7.0

No. of Google Citations:

17324

Google h-index:

47

Google i10-index:

393

Abstract Views:

5,819,908

PDF Download:

3,790,637

Last updated: June 24, 2024

IndexedBy

Indexed In

Follow us

Follow Us

Most Cited Articles

The ITB Unit Hydrograph Method: A Novel Approach to User-Defined Unit Hydrograph Development (Part II)

May 1, 2025
Dantje K. Natakusumah et al.
Vol. 11 No. 5 (2025): May

Sustainable Interlocking Blocks Containing Sugarcane Bagasse Ash: Structural Integrity, Cost Efficiency, and Environmental Benefits

May 1, 2025
Nitirach Sa-nguanduan et al.
Vol. 11 No. 5 (2025): May

Design a No-Fine Concrete Using Epoxy in Pavement

May 1, 2025
Hadel Obaidi et al.
Vol. 11 No. 5 (2025): May

Energy Optimization in Residential Buildings: Evaluating PCM-CLT Wall Systems Across U.S. Climate Zones

May 1, 2025
Amit Deb Nath et al.
Vol. 11 No. 5 (2025): May

Revolutionizing Recycled Aggregate Concrete: A Dual Approach Using HCl Treatment and Silica Fume

May 1, 2025
Wajde S. Alyhya et al.
Vol. 11 No. 5 (2025): May

visitors

Analytics

Flag Counter

Web Analytics
View My Stats

Information

  • For Readers
  • For Authors
  • For Librarians

Address

  • Talar bridge, Babol Road, Ghaemshahr, Mazandaran, Iran

Contact Info:

  • Prof. M. R. Kavianpour
  • Principal Contact
  • kavianpour@civilejournal.org
  • Help Desk
  • office@civilejournal.org
Copyright © Civil Engineering Journal , All rights reserved. This is an open-access article distributed under the terms of the Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License. Licensed under Creative Commons License a Creative Commons Attribution 4.0 International License. Site using Noble OJS 3 Theme
Themes by Openjournaltheme.com Themes by Openjournaltheme.com